
| Machine capacity | up to 5000 litter (300x4,500x4,750x2,1000x2,1500x1,1200x1,1500x1) |
| Production Per 12 hour | 40 minutes required for 3-layer tank production. 500 litter 4 tanks or 1000 litter 2 tanks 1500 litter 1 tank or 2000 litter 1 tank 3000 litter 1 tank or 5000 litter 1 tank |
| Total Cycle time | 30 min for double layer tank |
| Production Per Day | 36000 litter of 3 layer tanks, 54 tank( 500 litter 36 tank & 1000 litter 18 tanks ) |
| Electrical Load | 3hp |
| Fuel Consumption | Lpg gas fired (3.5 kg per cycle) |
| Processing Temperature | 210 c -250 c |
| Manpower Required | 2 semi-skilled + 1 operator - |
| Pit Size | length - 14ft, width - 11ft, depth - 7 ft |